Material MasterMaterial MasterBill of MaterialsSAPNovember 26, 20263 min read

Product Master Data in Manufacturing

How to validate bills of materials and routings before releasing production.

In product master data for manufacturing, material, bill of materials (BOM) and routing data must be consistent with one another. To release an in-house manufactured product, you need to verify whether the component structure and sequence of operations can be used in the ERP to plan, cost and produce the item.

Imagine that a finished product has a code, description, tax data and sales information filled in. If a required component has been left out of the bill of materials, material requirements planning (MRP) may fail to generate the corresponding demand, among several other impacts. The failure may only appear when the factory needs the component to produce.

What makes up a manufactured product's master data?

Material master. Identifies the product and brings together data such as description, unit of measure, classification and tax, sales, planning and cost information.

Bill of materials (BOM). Defines which components go into manufacturing, in what quantities and consumption units. It can include alternative components and have several levels when a semi-finished item has its own bill of materials.

Routing. Defines the operations, execution sequence, work centers, operation times and production resources and tools, where applicable.

In SAP, the production version links the product to the combination of bill of materials and routing used to manufacture the item. Validation checks whether this combination is valid for the applicable date and lot-size range.

What can go wrong when this data diverges?

A bill of materials with omitted or blocked components or incorrect quantities can generate incorrect purchasing requirements, shortages of inputs or excess inventory. A routing without a work center or without a time entered for an operation that requires this data can compromise capacity planning and hide bottlenecks.

Inconsistencies also affect planned cost. A missing component or an incorrect operation time can change the product's estimated cost and thereby influence sales pricing. If engineering updates a component and the change requires a different operation, reviewing the routing in the same flow helps prevent the factory from using outdated instructions.

How do you validate bills of materials and routings?

Include the checks in the creation and review flow for in-house manufactured items. The examples below were adapted from master data governance practices and simplified to preserve the original contexts. Each company can adjust the criteria according to the product family and manufacturing process.

Basic checks before release

  • Bill of materials. Check whether there is a BOM released for production and valid on the assessment date. For products that require stockable components, check whether there is at least one active component of this type with a quantity greater than zero. It is also worth checking whether there are blocked or obsolete components in the structure.
  • Routing. Check whether there is a routing released for production and valid on the assessment date. Check whether operations that require a work center and time have this data filled in, with times greater than zero where applicable.
  • Production version. Where applicable, check whether it points to the correct bill of materials and routing and whether the validity and lot-size range are compatible with the planned order.

Advanced validations with business rules

Component weight. For a product family, the company may require the total weight of the components to be between 100% and 110% of the finished product's weight. This example uses the finished product's weight as a reference and assumes that the components have been converted to the same unit of measure and calculated for the same base quantity.

Scrap percentage. For a group of raw materials with recurring losses due to surface imperfections, the flow may require a scrap percentage between 1% and 3% to be entered for the BOM component. The range should reflect the company's history and engineering criteria.

Component origin. If the component is an in-house manufactured semi-finished product, the rule may require a valid bill of materials, routing and cost calculation. If it is purchased, the check may require a purchasing info record or an applicable contract, according to the procurement policy.

How do you apply governance to product reviews?

Every change needs to trigger checks on the data it can affect. Replacing a raw material, for example, may require a new assessment of consumption, scrap, operation times and quality criteria. In a multilevel bill of materials, reviewing a semi-finished product can also affect the products that use it.

In the approval flow, engineering can review the structure, manufacturing can confirm the operations and planning can assess the impact on scheduling. Depending on the case, procurement, costing and quality take part in the related stages. This way, each area verifies what it needs to execute its part of the process before the change reaches the factory.

To explore quality criteria in more depth, read Data Quality in Master Data.

Frequently asked questions

What is the difference between a bill of materials and a routing?

The bill of materials, or BOM (Bill of Materials), states what goes into manufacturing and in what quantity. The routing describes how the product is manufactured, with the sequence of operations, work centers and required times.

When should a product's bill of materials and routing be revalidated?

The first validation takes place when the product is created. Repeat the check whenever a change could affect manufacturing. Changes to a component, quantity, operation, work center or validity are reasons to verify that the bill of materials, routing and production version remain compatible.

How does akquinet Brasil help govern product master data?

akquinet Brasil combines specialized master data governance consulting with MDM+ BRO, a solution integrated with SAP that brings together the material master, bill of materials and routing in the same creation or review flow. The consulting maps the dependencies between this data, the business rules and each area's responsibilities.

Based on this mapping, akquinet Brasil helps define which checks can be automated and which require assessment by the teams. Approval flows and decision traceability make it possible to track what was validated before release.

Want to review the release criteria for your products in SAP? Talk to akquinet Brasil's specialists.

About akquinet Brasil

We are specialists in master data governance and Master Data Management (MDM) solutions. As part of the German AKQUINET group, we have been present in Brazil since 2012, developing and implementing a wide range of projects for clients in various sectors such as retail, manufacturing, agribusiness, pharmaceutical, among others. With an experienced and highly qualified team, we have consolidated ourselves as a market reference, offering solutions such as MDM+ BRO, an SAP-certified add-on for ECC and S/4HANA environments, and MDM+ MUB, a SaaS platform for other ERPs, in addition to specialized consulting services in master data governance and processes.

Related articles

Master Data5 min

Single Source and Sole Source: Materials with Exclusive Supply

How to manage exclusively supplied materials and reduce supply chain risks.

Master Data3 min

Strategies for Duplicate and Similarity Checking of the Material Master

From prevention to data intelligence: how duplicate and similarity checks transform the quality of the material master and strengthen governance.

Material Master4 min

Signs of Bad Data in the SAP Material Master: 7 alerts for your operation

Identify 7 signs of bad data in the SAP material master and see how to reduce duplicates, inconsistencies and rework with akquinet Brasil.

Contact

Talk to akquinet

Ready to evolve your company's master data governance?

Talk to our specialists and learn how to structure a modern Master Data Center in your company.

AKQUINET BRAZIL

ERP used at your company *